Taachco energy infrastructure projects

546 MW Combined-Cycle Power Plant

Self Supply Power Plant

The 546 MW Chadormalu Combined-Cycle Power Plant, located in Ardakan County, Yazd Province, has been constructed to support stable electricity supply for industrial and mining complexes.

546 MW Combined-Cycle Power Plant
Ongoing Projects

546 MW Combined-Cycle Power Plant

• The 546 MW Chadormalu Combined-Cycle Power Plant, located in Ardakan County, Yazd Province, has been constructed to support stable electricity supply for industrial and mining complexes.
• The plant consists of two gas units, each with a capacity of 183 MW, and one steam unit of 180 MW, designed to provide reliable power to Chadormalu’s industrial and mining facilities.
• The first gas unit was connected to the national grid in June 2024, and the second unit in October 2024. Upon completion of the steam unit, the total capacity of the plant will reach 546 MW.
• The 546 MW Chadormalu Combined-Cycle Power Plant stands as a symbol of energy independence for the country’s major industries and represents a significant step toward energy security, optimized consumption, and sustainable development in Iran.

  • Project typeOngoing Projects
  • Project statusIn Progress
  • LocationArdakan County, Yazd Province
  • The 546 MW Chadormalu Combined-Cycle Power Plant, located in Ardakan County, Yazd Province, has been constructed to support stable electricity supply for industrial and mining complexes.

    The plant consists of two gas units, each with a capacity of 183 MW, and one steam unit of 180 MW, designed to provide reliable power to Chadormalu’s industrial and mining facilities.

    Technical Specifications

    The plant consists of two gas units, each with a capacity of 183 MW, and one steam unit of 180 MW, designed to provide reliable power to Chadormalu’s industrial and mining facilities.

    The first gas unit was connected to the national grid in June 2024, and the second unit in October 2024. Upon completion of the steam unit, the total capacity of the plant will reach 546 MW.

    Scope of Work

    The 546 MW Chadormalu Combined-Cycle Power Plant stands as a symbol of energy independence for the country’s major industries and represents a significant step toward energy security, optimized consumption, and sustainable development in Iran.

    Project Timeline

    1. Contract Award2022/01/04
    2. Project Commencement2023/05/22
    3. Synchronization of the First Gas Unit2024/06/20
    4. Synchronization of the Second Gas Unit2024/10/02

    Achievements

    • Maximizing the utilization of fossil fuels for power generation
    • Increasing power generation capacity and ensuring a reliable electricity supply for Yazd Province
    • Supplying the electricity requirements of large-scale and energy-intensive industries in close proximity to the point of consumption